Caskie Limited were integral to the planning and design of the project where certain considerations were made to key issues such as City Centre Location, Traffic Management and Time Restraints.
Our scope of works included –
- Carry out asbestos survey
- Traffic management and road closures
- Design and installation of temporary works and supports
- Design, manufacture and installation of permanent steel supports
- Divorce concrete bridge deck from existing structure and remove from site
- Take down bridge stanchions and remove from site
- Carry out planned concrete remedial work to existing structure
- All works were successfully completed within the planned time frame